River Linking Projects MCQs
20 free River Linking Projects multiple-choice questions for Static GK. Tap an option to answer — you get instant feedback, the correct answer, and a detailed explanation for every question.
Which organization prepares feasibility reports under India's National Perspective Plan for river linking?
- A National Water Development Agency
- B Central Pollution Control Board
- C Geological Survey of India
- D Central Water and Power Research Station
Correct answer: National Water Development Agency
The National Water Development Agency (NWDA) carries out surveys and prepares pre-feasibility, feasibility and detailed project reports for links under the National Perspective Plan. The Central Pollution Control Board focuses on pollution control, and the CWPRS is a hydraulic research institute.
The Ken-Betwa Link Project primarily connects rivers in which two states?
- A Himachal Pradesh and Uttar Pradesh
- B Madhya Pradesh and Uttar Pradesh
- C Odisha and Chhattisgarh
- D Karnataka and Andhra Pradesh
Correct answer: Madhya Pradesh and Uttar Pradesh
The Ken-Betwa Link Project links rivers flowing through Madhya Pradesh and Uttar Pradesh. Odisha and Chhattisgarh are associated with different river basin projects.
The Ken-Betwa Link Project proposes linking which two rivers?
- A Godavari and Krishna
- B Parbati and Kalisindh
- C Ken and Betwa
- D Son and Tons
Correct answer: Ken and Betwa
The project transfers surplus water from the Ken River to the Betwa River. The Godavari-Krishna link is a separate river-linking proposal.
India's National Perspective Plan for river linking was launched in which year?
- A 1975
- B 1988
- C 1995
- D 1980
Correct answer: 1980
The National Perspective Plan for inter-basin water transfer was formulated in 1980 by the then Ministry of Irrigation and the Central Water Commission. The first National Water Policy, adopted in 1987, is a separate document.
The National Perspective Plan broadly consists of how many components?
- A Two components
- B Three components
- C Four components
- D Six components
Correct answer: Two components
The plan has two major components: the Himalayan Rivers Development and the Peninsular Rivers Development. Three components is a common misconception.
Which of the following is a major objective of river linking projects?
- A Inter-basin water transfer
- B Expansion of marine fisheries
- C Construction of airports
- D Promotion of coastal tourism
Correct answer: Inter-basin water transfer
River linking aims to transfer water from surplus basins to deficit basins through inter-basin transfers. Airport construction is unrelated to these projects.
The Himalayan component of river linking mainly seeks to utilize surplus water from which region?
- A Western Ghats rivers
- B Peninsular river systems
- C Himalayan river systems
- D Eastern Coastal Plains
Correct answer: Himalayan river systems
The Himalayan component focuses on harnessing surplus flows from Himalayan rivers. The Western Ghats are mainly associated with peninsular river systems.
Which ministry oversees major river-linking initiatives in India?
- A Ministry of Environment
- B Ministry of Agriculture
- C Ministry of Power
- D Ministry of Jal Shakti
Correct answer: Ministry of Jal Shakti
The Ministry of Jal Shakti is responsible for water resources and river-linking initiatives. The Ministry of Environment provides clearances but does not oversee implementation.
The Ken-Betwa Link Project is mainly intended to benefit which region?
- A Bundelkhand region
- B Konkan region
- C Rayalaseema region
- D Doab region
Correct answer: Bundelkhand region
The project is designed to improve irrigation and water availability in the drought-prone Bundelkhand region. The Konkan region has different hydrological conditions.
The Peninsular Rivers Development component mainly focuses on linking rivers of which part of India?
- A Indus plains
- B Southern India
- C North-Eastern hills
- D Western Himalayas
Correct answer: Southern India
The Peninsular component aims to link rivers of southern and central India, such as the Mahanadi, Godavari, Krishna and Cauvery. The Indus and Gangetic plains belong to the Himalayan river systems.
Which of the following is often cited as a challenge in river-linking projects?
- A Low tourism potential
- B Urban traffic congestion
- C Environmental concerns
- D Telecom spectrum allocation
Correct answer: Environmental concerns
Environmental impacts, including biodiversity and ecosystem changes, are major concerns in river-linking projects. Urban traffic issues are unrelated to these schemes.
The National Water Development Agency functions under which ministry?
- A Ministry of Environment
- B Ministry of Agriculture
- C Ministry of Power
- D Ministry of Jal Shakti
Correct answer: Ministry of Jal Shakti
The National Water Development Agency operates under the Ministry of Jal Shakti. The Ministry of Agriculture has no direct administrative control over the agency.
River-linking projects are primarily intended to transfer water from which basins?
- A Surplus to deficit basins
- B Urban to rural regions
- C Coastal regions to desert areas
- D Reservoirs to wetlands
Correct answer: Surplus to deficit basins
The main objective is to transfer water from surplus river basins to water-deficit basins. Urban-to-rural transfer is not the guiding principle of these projects.
Which river-link project became India's first inter-state river linking project under implementation?
- A Par-Tapi-Narmada Link
- B Ken-Betwa Link
- C Kosi-Mechi Link
- D Damanganga-Pinjal Link
Correct answer: Ken-Betwa Link
The Ken-Betwa Link Project became the first inter-state river-linking project to move into implementation. The Damanganga-Pinjal proposal is still at a different planning stage.
The river-linking programme mainly aims to improve which sector?
- A Civil aviation
- B Mining
- C Irrigation
- D Telecommunications
Correct answer: Irrigation
Improving irrigation through better water availability is one of the primary goals of river linking. Civil aviation has no connection with these projects.
Which category of rivers forms one component of the National Perspective Plan?
- A Glacial lakes
- B Coastal streams
- C Underground rivers
- D Peninsular rivers
Correct answer: Peninsular rivers
The National Perspective Plan consists of the Himalayan and Peninsular river components. Coastal streams are not recognized as a separate component.
Which of the following is a commonly expected benefit of river-linking projects?
- A Reduction in flood damage
- B Increase in tidal waves
- C Expansion of coastal coral reefs
- D Growth of glaciers
Correct answer: Reduction in flood damage
By redistributing surplus water, river-linking projects aim to reduce flood damage in some regions while helping drought-prone areas. They do not influence glacier growth.
Which type of water transfer is central to river-linking projects?
- A Inter-basin transfer
- B Groundwater extraction
- C Rainwater harvesting
- D Desalination process
Correct answer: Inter-basin transfer
Inter-basin water transfer is the defining concept behind river-linking projects. Rainwater harvesting is valuable for water conservation but is a separate strategy.
The river-linking programme mainly seeks to address which natural challenge?
- A Volcanic eruptions
- B Cyclone formation
- C Regional water imbalance
- D Seismic activity in the Himalayas
Correct answer: Regional water imbalance
River-linking aims to reduce regional water imbalance by transferring water from surplus to deficit basins. Cyclone formation is unrelated to the programme's objectives.
The Ken-Betwa Link Project mainly involves rivers belonging to which major river system?
- A Godavari basin
- B Brahmaputra basin
- C Son basin
- D Yamuna basin
Correct answer: Yamuna basin
Both the Ken and Betwa are tributaries of the Yamuna, making the project part of the Yamuna river system. The Godavari basin is associated with separate river-link proposals.