Which ministry is primarily responsible for implementing the National Supercomputing Mission (NSM)?
- A Ministry of Science and Technology
- B Ministry of Electronics and IT
- C Ministry of Education
- D Ministry of Communications
Correct answer: Ministry of Electronics and IT
The NSM is jointly implemented by the Ministry of Electronics and Information Technology (MeitY) and the Department of Science and Technology (DST). The Ministry of Science and Technology is a common distractor as it hosts the DST.
What is the primary objective of the National Supercomputing Mission?
- A Improve mobile connectivity
- B Enhance computing power
- C Promote AI in schools
- D Boost satellite launches
Correct answer: Enhance computing power
The mission aims to empower academic and R&D institutions by installing a vast grid of supercomputing facilities. Promoting AI is a related but secondary goal, often confusing students.
Which two departments are the nodal agencies for the National Supercomputing Mission?
- A MeitY and DST
- B ISRO and DRDO
- C CSIR and ICAR
- D NITI Aayog and MHRD
Correct answer: MeitY and DST
MeitY and DST act as the two nodal agencies implementing the mission. ISRO and DRDO are frequently guessed because they represent major Indian technological advancement.
Which institution is responsible for the design and development of the 'PARAM' series of supercomputers?
- A IIT Delhi
- B CDAC
- C IISc
- D C-DOT
Correct answer: CDAC
The Centre for Development of Advanced Computing (CDAC) leads the design of supercomputers under the NSM. IITs are often mistaken as the developers due to their research roles.
The National Supercomputing Mission was launched in which year?
- A 2013
- B 2015
- C 2017
- D 2019
Correct answer: 2015
The NSM was approved by the government in 2015 for a period of seven years. 2017 is a common distractor as it marks other major policy launches.
Which of the following is an Indian supercomputer developed under the NSM?
- A Pratyush cluster
- B Mihir cluster
- C PARAM Shivay
- D Vikram-100
Correct answer: PARAM Shivay
PARAM Shivay was the first supercomputer assembled indigenously under the NSM. Pratyush is a high-performance computer for weather, often confused as part of the core NSM series.
The NSM aims to build a grid of supercomputing facilities across:
- A Private corporate technology hubs
- B State government technology offices
- C International airport terminals
- D Academic and research institutions
Correct answer: Academic and research institutions
The mission specifically targets academic and R&D institutions to foster research. Private hubs are excluded as the primary focus is on public research capacity.
What is the role of CDAC in the National Supercomputing Mission?
- A Funding the mission
- B Policy formulation
- C International collaboration
- D Design and implementation
Correct answer: Design and implementation
CDAC serves as the implementation partner, responsible for designing and deploying systems. Policy formulation is handled by the ministries, not CDAC.
Which Indian institute housed the 'PARAM Shivay' supercomputer?
- A IIT Kanpur
- B IIT Kharagpur
- C IIT (BHU)
- D IISc Bangalore
Correct answer: IIT (BHU)
PARAM Shivay, the first supercomputer built under NSM, was installed at IIT BHU. IIT Kanpur is a common distractor due to its known advanced research infrastructure.
Supercomputing capability is crucial for which of the following applications?
- A Climate modeling
- B E-commerce logistics
- C Social media traffic
- D Data storage
Correct answer: Climate modeling
Climate modeling, drug discovery, and computational fluid dynamics require massive processing power provided by supercomputers. E-commerce logistics is better suited for cloud computing.
How many phases were initially planned for the National Supercomputing Mission?
- A Two initial phases
- B Three phases
- C Four phases
- D Five phases
Correct answer: Three phases
The mission was structured into three phases to achieve its objectives of capacity building. Two phases is a common incorrect guess given the long duration.
Which supercomputer was installed at IIT Kharagpur under the NSM?
- A PARAM Shakti
- B PARAM Brahma
- C PARAM Porul
- D PARAM Ananta
Correct answer: PARAM Shakti
PARAM Shakti is the supercomputer deployed at IIT Kharagpur under the NSM. PARAM Brahma is a different system, often confused by candidates.
Under the NSM, what is the main goal regarding the 'Hardware' components?
- A Importing all hardware components
- B Indigenization of components
- C Licensing foreign patents
- D Buying cloud space
Correct answer: Indigenization of components
A key focus of NSM is to minimize imports and promote indigenization of computing hardware. Importing is the opposite of the mission's 'Atmanirbhar' goal.
The 'PARAM Ananta' supercomputer was commissioned at which institute?
- A IIT Gandhinagar
- B IIT Ropar
- C IIT Hyderabad
- D NIT Tiruchirappalli
Correct answer: IIT Gandhinagar
PARAM Ananta is located at IIT Gandhinagar. IIT Ropar is often confused with it as it also hosts an NSM-deployed machine.
Which of these is NOT a pillar of the National Supercomputing Mission?
- A Infrastructure
- B Human Resource Development
- C Application Development
- D Retail Sector Expansion
Correct answer: Retail Sector Expansion
The pillars of NSM are Infrastructure, Applications, R&D, and HRD. Retail sector expansion has no relevance to this high-performance computing mission.
Which supercomputer was deployed at IIT Kanpur under the NSM?
- A PARAM Sanganak
- B PARAM Shakti
- C PARAM Shivay
- D PARAM Siddhi-AI
Correct answer: PARAM Sanganak
PARAM Sanganak is the machine deployed at IIT Kanpur. PARAM Siddhi-AI is a different NSM supercomputer (at C-DAC Pune), often confused with it by candidates.
Who provides the funding support for the National Supercomputing Mission?
- A World Bank
- B Government of India
- C Private Industry
- D Foreign universities
Correct answer: Government of India
The NSM is a government-funded initiative aimed at building domestic capability. World Bank funding is a common, incorrect assumption for large national tech projects.
Which of these supercomputers was commissioned at IIT Ropar?
- A PARAM Brahma
- B PARAM Ananta
- C PARAM Porul
- D PARAM Shivay
Correct answer: PARAM Brahma
PARAM Brahma is the system installed at IIT Ropar. Candidates often mix up the names of various 'PARAM' machines deployed at different IITs.
The 'PARAM Porul' supercomputer is located at which institution?
- A NIT Tiruchirappalli
- B IIT Guwahati
- C IISER Pune
- D NIT Calicut, Kerala
Correct answer: NIT Tiruchirappalli
PARAM Porul was commissioned at NIT Tiruchirappalli. IIT Guwahati is frequently guessed due to its prominent technological status.
What is the long-term impact of NSM on Indian research?
- A Reduced research time
- B Increased research costs
- C Foreign dependency
- D Manual data processing
Correct answer: Reduced research time